Saturday Updatia
Mar. 25th, 2008 08:40 am![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
Saturday, Justin and I spent the morning forking around with over-ripe compost and seed mix - maybe fifteen to twenty wheelbarrows worth. And this wheelbarrow, we joked, was bigger than the other crew's pickup truck...
...not quite, but it was 8 cubic feet of heavy crap (pretty much literally) and mushrooms. Very heavy. After about eight or ten trips, we were joined by one of the members of the board. This made it much easier to get up the steep, soft bank to where we were spreading the stuff. Thankfully, we had two wheel drive - a single-wheel wheelbarrow would have bogged and flipped with what we were putting it through. Of course, the fun part was the scent of amonia that steamed out when you ripped into the stuff to load it.
We wrapped up with a single load of wood chips, to assist the singing wheelbarrow, split between a garden bed at the Osprey House and a bench overlooking the pond. Then it was pizza, donated by one of the other members who was volunteering, and we were done.
After that, we headed over to deliver and review the three detailed designs with the customers. We added a few things to one of the design, and should get approval mid-week.
...not quite, but it was 8 cubic feet of heavy crap (pretty much literally) and mushrooms. Very heavy. After about eight or ten trips, we were joined by one of the members of the board. This made it much easier to get up the steep, soft bank to where we were spreading the stuff. Thankfully, we had two wheel drive - a single-wheel wheelbarrow would have bogged and flipped with what we were putting it through. Of course, the fun part was the scent of amonia that steamed out when you ripped into the stuff to load it.
We wrapped up with a single load of wood chips, to assist the singing wheelbarrow, split between a garden bed at the Osprey House and a bench overlooking the pond. Then it was pizza, donated by one of the other members who was volunteering, and we were done.
After that, we headed over to deliver and review the three detailed designs with the customers. We added a few things to one of the design, and should get approval mid-week.